{"id":40889,"date":"2024-09-10T18:54:09","date_gmt":"2024-09-10T16:54:09","guid":{"rendered":"https:\/\/composites-united.com\/?p=40889"},"modified":"2024-09-11T17:49:24","modified_gmt":"2024-09-11T15:49:24","slug":"the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance","status":"publish","type":"post","link":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/","title":{"rendered":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance"},"content":{"rendered":"<h3><strong>Introduction<\/strong><\/h3>\n<p>Generating an optimal production schedule is essential for manufacturing operations, having a significant impact on the efficiency and productivity of the whole operation and, hence, on top and bottom line, as well as on-time delivery dates. Yet, building a high-quality schedule for large complex operations has been known to be one of the most challenging business tasks. Additionally, such large-scale automation enables the automatic generation of optimal schedules for a long time horizon, e.g., months in advance. This opens the door to new AI applications for promising delivery dates based on a more accurate assessment of future resource availability, and for tactical capacity planning.<\/p>\n<p>Read the full in-depth article on: &#8216;A Breakthrough in Scale and Performance for Manufacturing Scheduling &#8211; The Practimum-Optimum Algorithm&#8217;, by Prof. Moshe Ben-Bassat (Chairman of Plataine) <a href=\"https:\/\/www.composites-united.com\/wp-content\/uploads\/2024\/09\/A-Breakthrough-in-Scale-and-Performance-for-Manufacturing-Scheduling-The-Practimum-Optimum-Algorithm.pdf\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction Generating an optimal production schedule is essential for manufacturing operations, having a significant impact on the efficiency and productivity of the whole operation and, hence, on top and bottom line, as well as on-time delivery dates. Yet, building a high-quality schedule for large complex operations has been known to be one of the most [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[30,171],"tags":[],"main-cat":[55,34],"bildung":[],"forschungs-cat":[],"class_list":["post-40889","post","type-post","status-publish","format-standard","hentry","category-info","category-top-news","maincategory-cu-nord","maincategory-cu-ost"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Anna-Lea Glocker\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Composites United e.V.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/04\/opengraph.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/04\/opengraph.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1206\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-09-10T16:54:09+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-09-11T15:49:24+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"http:\/\/CarbonComposites.eu\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@CarbonComposit1\" \/>\n\t\t<meta name=\"twitter:title\" content=\"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@CarbonComposit1\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/04\/opengraph.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#article\",\"name\":\"The Practimum-Optimum\\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.\",\"headline\":\"The Practimum-Optimum\\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance\",\"author\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/author\\\/aglockercu\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.composites-united.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/cu_logo_invers_icon.png\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#articleImage\",\"width\":500,\"height\":280},\"datePublished\":\"2024-09-10T18:54:09+02:00\",\"dateModified\":\"2024-09-11T17:49:24+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#webpage\"},\"articleSection\":\"Info, Top News, Optional, CU Nord, CU Ost\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/category\\\/info\\\/#listItem\",\"name\":\"Info\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/category\\\/info\\\/#listItem\",\"position\":2,\"name\":\"Info\",\"item\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/category\\\/info\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#listItem\",\"name\":\"The Practimum-Optimum\\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#listItem\",\"position\":3,\"name\":\"The Practimum-Optimum\\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/category\\\/info\\\/#listItem\",\"name\":\"Info\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#organization\",\"name\":\"Composites United e.V.\",\"description\":\"Das Netzwerk\",\"url\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.composites-united.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/cu_logo_invers_icon.png\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#organizationLogo\",\"width\":500,\"height\":280},\"image\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#organizationLogo\"},\"sameAs\":[\"http:\\\/\\\/CarbonComposites.eu\",\"https:\\\/\\\/twitter.com\\\/CarbonComposit1\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/author\\\/aglockercu\\\/#author\",\"url\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/author\\\/aglockercu\\\/\",\"name\":\"Anna-Lea Glocker\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/81c3a1f1bc43712f1b4f1303495f1c739ad4f4609b570b0c06d07e3e83fea777?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Anna-Lea Glocker\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#webpage\",\"url\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/\",\"name\":\"The Practimum-Optimum\\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/author\\\/aglockercu\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/author\\\/aglockercu\\\/#author\"},\"datePublished\":\"2024-09-10T18:54:09+02:00\",\"dateModified\":\"2024-09-11T17:49:24+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/\",\"name\":\"Composites United e.V.\",\"description\":\"Das Netzwerk\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.composites-united.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.","description":"","canonical_url":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#article","name":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.","headline":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance","author":{"@id":"https:\/\/www.composites-united.com\/en\/author\/aglockercu\/#author"},"publisher":{"@id":"https:\/\/www.composites-united.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/01\/cu_logo_invers_icon.png","@id":"https:\/\/www.composites-united.com\/en\/#articleImage","width":500,"height":280},"datePublished":"2024-09-10T18:54:09+02:00","dateModified":"2024-09-11T17:49:24+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#webpage"},"isPartOf":{"@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#webpage"},"articleSection":"Info, Top News, Optional, CU Nord, CU Ost"},{"@type":"BreadcrumbList","@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.composites-united.com\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.composites-united.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.composites-united.com\/en\/category\/info\/#listItem","name":"Info"}},{"@type":"ListItem","@id":"https:\/\/www.composites-united.com\/en\/category\/info\/#listItem","position":2,"name":"Info","item":"https:\/\/www.composites-united.com\/en\/category\/info\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#listItem","name":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.composites-united.com\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#listItem","position":3,"name":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance","previousItem":{"@type":"ListItem","@id":"https:\/\/www.composites-united.com\/en\/category\/info\/#listItem","name":"Info"}}]},{"@type":"Organization","@id":"https:\/\/www.composites-united.com\/en\/#organization","name":"Composites United e.V.","description":"Das Netzwerk","url":"https:\/\/www.composites-united.com\/en\/","logo":{"@type":"ImageObject","url":"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/01\/cu_logo_invers_icon.png","@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#organizationLogo","width":500,"height":280},"image":{"@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#organizationLogo"},"sameAs":["http:\/\/CarbonComposites.eu","https:\/\/twitter.com\/CarbonComposit1"]},{"@type":"Person","@id":"https:\/\/www.composites-united.com\/en\/author\/aglockercu\/#author","url":"https:\/\/www.composites-united.com\/en\/author\/aglockercu\/","name":"Anna-Lea Glocker","image":{"@type":"ImageObject","@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/81c3a1f1bc43712f1b4f1303495f1c739ad4f4609b570b0c06d07e3e83fea777?s=96&d=mm&r=g","width":96,"height":96,"caption":"Anna-Lea Glocker"}},{"@type":"WebPage","@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#webpage","url":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/","name":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.composites-united.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/#breadcrumblist"},"author":{"@id":"https:\/\/www.composites-united.com\/en\/author\/aglockercu\/#author"},"creator":{"@id":"https:\/\/www.composites-united.com\/en\/author\/aglockercu\/#author"},"datePublished":"2024-09-10T18:54:09+02:00","dateModified":"2024-09-11T17:49:24+02:00"},{"@type":"WebSite","@id":"https:\/\/www.composites-united.com\/en\/#website","url":"https:\/\/www.composites-united.com\/en\/","name":"Composites United e.V.","description":"Das Netzwerk","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.composites-united.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Composites United e.V.","og:type":"article","og:title":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.","og:url":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/","og:image":"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/04\/opengraph.png","og:image:secure_url":"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/04\/opengraph.png","og:image:width":1920,"og:image:height":1206,"article:published_time":"2024-09-10T16:54:09+00:00","article:modified_time":"2024-09-11T15:49:24+00:00","article:publisher":"http:\/\/CarbonComposites.eu","twitter:card":"summary_large_image","twitter:site":"@CarbonComposit1","twitter:title":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance | Composites United e.V.","twitter:creator":"@CarbonComposit1","twitter:image":"https:\/\/www.composites-united.com\/wp-content\/uploads\/2020\/04\/opengraph.png"},"aioseo_meta_data":{"post_id":"40889","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","location":null,"local_seo":null,"limit_modified_date":false,"created":"2024-09-10 16:53:49","updated":"2024-09-11 15:49:24","ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.composites-united.com\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.composites-united.com\/en\/category\/info\/\" title=\"Info\">Info<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tThe Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.composites-united.com\/en\/"},{"label":"Info","link":"https:\/\/www.composites-united.com\/en\/category\/info\/"},{"label":"The Practimum-Optimum\u2122 Algorithm for Manufacturing Scheduling: A Paradigm Shift Leading to Breakthroughs in Scale and Performance","link":"https:\/\/www.composites-united.com\/en\/the-practimum-optimum-algorithm-for-manufacturing-scheduling-a-paradigm-shift-leading-to-breakthroughs-in-scale-and-performance\/"}],"_links":{"self":[{"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/posts\/40889","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/comments?post=40889"}],"version-history":[{"count":1,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/posts\/40889\/revisions"}],"predecessor-version":[{"id":40890,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/posts\/40889\/revisions\/40890"}],"wp:attachment":[{"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/media?parent=40889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/categories?post=40889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/tags?post=40889"},{"taxonomy":"maincategory","embeddable":true,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/main-cat?post=40889"},{"taxonomy":"bildung","embeddable":true,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/bildung?post=40889"},{"taxonomy":"forschung","embeddable":true,"href":"https:\/\/www.composites-united.com\/en\/wp-json\/wp\/v2\/forschungs-cat?post=40889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}